Specification

Structure R.C.C framed earthquake resistance structure.
Super Structure Brick masonary with C.M.
Doors Main Door Teak wood frame with Teak wood shutters internal doors teak doors with flush doors shutters.
Windows Teak wood frames and teak wood shutters with 4mm thickness glass.
Flooring 2'*2' Vitrified tiles.
Finishing Cement plastering two coats with sponge finish.
Electrical Concealed copper wiring with adequate points and Modular switches of standard make.
Plumbing CPVC water lines with C.P plumbing fixtures of standard make. P.V.C lines for Drainage.
Sanitary Colour vitreous ceramic sanitary fixtures of standard make.
Tiles 6'0" Ht. Glazed tiles dado for toilet walls granite slab topped kitchen platform.
Painting Wood polish finish for main door gray lappam with synthetic enamel paint for inside doors and windows. Altek lappam with plastic emulsion paint for inside walls. O.B.O. Paint for ceilings. Weather shield paint for external elevation walls.
Lift 6 passenger lift of standard make.
Genarator 20 KVA for lift, common area and motors.
Note Car parking, Electrical transformer taxes & duties will be extra.

© 2016 Sree Durga Estates . All rights reserved